Vacant Property Refurbishment Grant: What It Means for the Roof
Buying or reviving a vacant home in Dublin? How the Vacant Property Refurbishment Grant treats roof works, the 2026 cost caps, and the order to do things in.

A house that has stood empty for a few years almost always has roof work waiting for it. Nobody has been cleaning the gutters, nobody noticed the slipped slate after the last storm, and a small leak has had time to soak into timbers and ceilings. We see this regularly in older terraces and semi-detached homes across Dublin City and North Dublin, and in vacant houses further out in Lucan, Bray, Wicklow and Naas.
If you are buying or have inherited a vacant home, the Vacant Property Refurbishment Grant can help pay for that work. This guide focuses on how the grant treats the roof, what the current caps are, and the order to do things in so the application is not put at risk. Figures come from the gov.ie service page and the scheme outline dated August 2026. Your local council makes the final decisions, so always confirm with them.
The grant in brief
According to gov.ie:
- It is for turning a vacant house or building into your permanent home or a rental property.
- The property must have been vacant for at least two years when you apply and built before 2008.
- Applications are made by named owners, or people in active negotiations to buy. It is not available to registered companies.
- It applies in cities, towns, villages and rural areas, so Dublin City, Fingal, South Dublin and Dún Laoghaire-Rathdown homes can qualify, as can homes in Kildare and Wicklow.
- The grant is up to €50,000 for a vacant property, with a top-up of up to €20,000 (total up to €70,000) where the property is confirmed derelict. The grant includes VAT.
The scheme outline adds that rental units must be registered with the Residential Tenancies Board before the grant is paid and cannot be used for short-term letting. If you claim it for your own home, clawback conditions apply if you stop living there as your principal private residence within ten years of payment.
Where roof work sits in the table of works
The scheme outline sets caps for each category of work, based on a typical two-storey, three-bed semi-detached house. Roof work appears in more than one place:
| Category in the scheme outline | Roof-related items | Cap (incl. VAT) |
|---|---|---|
| 3. Superstructure works | Roof structure, chimneys, other structural timbers | Up to the overall grant (€50,000, or €70,000 with the derelict top-up) |
| 4b. External completions | Fascias, soffits, rainwater goods | €4,200 |
| 4c. Roof completions | Roof lights and associated flashings | €1,000 |
| 4e. Roof completions | Roof completions | €14,000 |
| 4. Category total | All external completions and finishes, including doors and windows | €42,700 |
In plain terms:
- Rotten rafters, sagging roof structure or a failing chimney stack fall under superstructure works, which are capped only by the overall grant.
- Roof coverings (slates or tiles, battens, membrane and similar finishing work) sit in the €14,000 "roof completions" line.
- Gutters, downpipes, fascia and soffit share a €4,200 line.
- Roof windows and their flashings have a small €1,000 line, so a Velux replacement may only be partly covered.
These caps apply to the whole house, not just the roof. Windows, doors and external painting come out of the same €42,700 category total. The council also applies a "reasonable cost assessment", so it may approve less than the quoted price, and the outline notes it may pay a lower amount after reviewing invoices or inspecting the work.
Do not start the roof before approval
This is the point that catches people out. The scheme outline states that the works proposed must be approved in advance, following inspection by the local authority. Approval comes as a letter listing the approved works, and the grant is paid on completion, after a review of invoices or receipts and a final inspection. Once approved, the works must be completed within 18 months.
So if you replace the roof first and apply afterwards, you risk losing the roof portion of the grant. A sensible order is:
- Get the roof surveyed before or shortly after you buy, so you know what you are dealing with.
- Get a written, itemised quotation that separates structural roof timbers, roof covering, chimney work, gutters and fascia, and roof windows. That makes it easier for the council to match it to its table of works.
- Apply to your council with the quotation, proof of vacancy and proof of ownership.
- Wait for the approval letter, then book the work.
- Keep every invoice and photo for the final inspection.
If the roof is letting water in while you wait, talk to your council before doing anything beyond temporary weatherproofing, and keep photos of the condition before any work. A tarpaulin or a temporary patch to protect the house is very different from starting the full job.
Tax clearance and paperwork for roofing work
The scheme outline says applicants must show their own tax clearance and that of every contractor who carried out construction work over €650. It puts the responsibility on you to get your contractor's tax clearance certificate immediately before paying them. Missing contractor tax clearance at drawdown stage may lead to the grant being refused. Revenue explains the requirement on its tax clearance for grants page.
When you get a roofing quote for a grant application, ask for:
- A clear breakdown by item, with VAT shown.
- A description of what is being repaired or replaced, and why.
- Photos of the defects, especially anything you cannot see from the ground.
- Confirmation that the contractor can provide a current tax clearance certificate.
Combining it with other grants
The scheme outline says SEAI grants may be used alongside the Vacant Property Refurbishment Grant, but the same work cannot be funded twice. For example, if attic insulation is paid for by an SEAI home energy grant, it will not also be funded by the vacant property grant. You must declare other grants applied for or approved on the application form.
Insulation and roof repairs also need to happen in the right order. We covered that in our guide to fixing the roof before SEAI attic insulation.
What we usually find on a vacant house roof
After two or more years without maintenance, these are the problems we see most often on empty homes around Dublin:
| What we find | Why it matters |
|---|---|
| Gutters full of moss and leaves | Overflowing water soaks fascia boards and walls |
| Slipped or missing slates and tiles | Lets rain onto the underlay or straight into the attic |
| Cracked ridge or hip mortar | Common after years of frost and wind |
| Chimney flashing and pointing failure | A frequent source of damp on chimney breasts |
| Wet or rotten timbers near old leaks | May turn a covering repair into structural work |
| Birds or pests nesting under eaves | Damaged soffits and blocked ventilation |
| Old roof windows with failed seals | Often cheaper to replace than repair |
Many vacant homes were built before modern breathable membranes, so the underlay may be old bitumen felt that has sagged or torn. Older houses in Dublin City may also have natural slate roofs, valleys or box gutters that need specialist repair. Our pre-purchase roof inspection checklist explains what a full roof check covers.
Please do not climb onto the roof or into a damaged attic of a vacant house yourself. Floors, ceilings and roof timbers may be weaker than they look. Photos from the ground, binoculars and a look through the attic hatch from a secure ladder are enough to start the conversation.
Repair or replace?
A grant application is a good time to make the repair-or-replace decision properly. If the slates or tiles are at the end of their life, the battens are rotten, or the underlay has failed across large areas, replacing the roof covering once may make more sense than paying for repeated patches. If the structure is sound and the problems are local, a targeted repair can leave more of the grant for windows, heating and the rest of the house.
Our guide on whether to repair or replace a roof walks through the signs, and our roof repair quote checklist helps you compare prices.
Questions to ask your council
Rules can be applied slightly differently between councils, so check these before you commit:
- Can they inspect the property soon, given the roof is letting in water?
- What temporary weatherproofing, if any, can be done before approval?
- Will they accept one itemised roofing quote, or do they want more than one?
- How do they treat a full roof replacement against the €14,000 roof completions cap?
- Are the planning or building regulation steps needed for your roof work, for example on a protected structure?
Get a roof survey and itemised quote
We survey and repair roofs on vacant and newly bought homes across Dublin City, North Dublin, South Dublin, Lucan, Bray, Wicklow, Naas and nearby areas. We can check the roof, gutters, chimneys and roof windows, take photos, and give you an itemised quote laid out so it is easy to use with your grant application.
Contact us by WhatsApp, call 083 066 3462, or email hi@perfectroofing.ie.
Need a roofer to take a look?
Send a few photos on WhatsApp, email us, or tap the number to call. We cover Dublin City, North Dublin, South Dublin, Lucan, Bray, Wicklow, Naas, and nearby locations.